Good quality track ballast is made of crushed stone. The sharp edges help the particles interlock with each other.

Track ballast forms the trackbed upon which railway sleepers (UK) or railroad ties (US) are laid. It is packed between, below, and around the ties.[1] It is used to facilitate drainage of water, to bear the load from the railroad ties, and also to keep down vegetation that might interfere with the track structure.[1] This also serves to hold the track in place as the trains roll by. It is typically made of crushed stone, although ballast has sometimes consisted of other, less suitable materials. The term "ballast" comes from a nautical term for the stones used to stabilize a ship.[1]

Contents

Material properties [edit]

Pile of ballast in Tuxedo, New York for track repair following Hurricane Irene

A good ballast should be strong, hard-wearing, stable, drainable, easy to clean, workable, resistant to deformation, easily available, and reasonably cheap to purchase.[2] Early railway engineers did not understand the importance of quality track ballast[citation needed]; they would use cheap and easily-available materials such as ashes, chalk, clay,[3] earth, and even cinders from locomotive fireboxes.[4] It was soon clear that good-quality ballast made of rock was necessary if there were to be a good foundation and adequate drainage.[3]

Good quality track ballast is made of crushed natural rock with particles between 28 mm and 50 mm in diameter;[5] a high proportion of particles finer than this will reduce its drainage properties, and a high proportion of larger particles result in the load on the ties being distributed improperly.[5] Angular stones are preferable to naturally rounded ones, as angular stones interlock with each other, inhibiting track movement.[1][5] Soft materials such as limestone are not particularly suitable, as they tend to degrade under load when wet, causing deterioration of the line; granite, although expensive, is one of the best materials in this regard.[5]

In the early days of railroads in the United States, much material for ballast came from rock found in the local area. In the Midwest, for example, much use was made of quartzite, while states in the southeast, such as Florida, made use of limestone. One specific type of quartzite used in the Midwest earned the name "Pink Lady" due to its color;[6] in other areas, the ballast can be a mix of light and dark colors called "Salt and Pepper".

Construction [edit]

The thickness of a layer of track ballast depends on the size and spacing of the ties, the amount of traffic expected on the line, and various other factors.[1] Track ballast should never be laid down less than 150 mm (6 inches) thick;[5] high-speed railway lines may require ballast up to half a metre (20 inches) thick.[7] An insufficient depth of ballast overloads the underlying soil; in the worst cases, this can cause the track to sink.[8] If the ballast is less than 300 mm (12 inches) thick, this can lead to vibrations, which can damage nearby structures (though increasing the depth beyond this has no measurable effect).[9]

Track ballast typically sits on a layer of sub-ballast; the latter is typically made of small crushed stones. It gives a solid support for the top ballast, and seals out water from the underlying ground.[1] Sometimes, an elastic mat is placed under the ballast layer as well; this can allow for significant reductions in vibration.[9]

It is essential for ballast to be piled as high as the ties, and for a substantial "shoulder" to be placed at their ends;[5] the latter being especially important, since this ballast shoulder is, for the most part, the only thing restraining lateral movement of the track.[10] The ballast shoulder should be at least 150 mm (6 inches) wide under any circumstances, and may be as large as 450 mm (18 inches).[11]

Maintenance [edit]

New track ballast is placed at the Boxmeer railway station, The Netherlands.
A ballast regulator shaping newly placed ballast
Ballast tamping machine as used in railroad track maintenance -- Dade City, Florida

If ballast is badly fouled, the clogging will reduce its ability to drain properly; this, in turn, causes more debris to be sucked up from the sub-ballast, causing more fouling.[7][12] Therefore, keeping the ballast clean is essential. Bioremediation can be used to clean ballast.[13]

It is not always necessary to replace the ballast if it is fouled, nor must all the ballast be removed if it is to be cleaned. Removing and cleaning the ballast from the shoulder is often sufficient, if shoulder ballast is removed to the correct depth.[14][15] While this job was historically done by manual labour,[15] this process is now, like many other railway maintenance tasks, a mechanised one,[16] with a chain of specially-designed railroad cars handling the task. One wagon cuts the ballast and passes it via a conveyor belt to a cleaning machine, then the cleaning wagon washes the ballast, and deposits the dirt and ballast into other wagons for disposal and re-use, respectively.[14] Such machines can clean up to two kilometres of ballast in an hour.[17]

Cleaning, however, can only be done a certain number of times before the ballast is damaged to the point that it cannot be re-used; furthermore, track ballast that is completely fouled can not be corrected by shoulder cleaning.[18] In such cases, it is necessary to replace the ballast altogether. One method of "replacing" ballast, if necessity demands, is to simply dump fresh ballast on the track, jack the whole track on top of it, and then tamp it down;[15] alternatively, the ballast underneath the track can be removed with an undercutter, which does not require removing or lifting the track.[18]

The dump and jack method cannot of course be used through tunnels, under overbridges, and where there are platforms. Where the track is laid over a swamp, such as the Hexham swamp, the ballast continuously sinks, and needs to be topped up to maintain its line and level. After 150 years of topping up, there appears to be 10m of sunken ballast under the tracks[citation needed]. Chat Moss in the United Kingdom is similar.[citation needed]

Regular inspection of the ballast shoulder is important;[5] as noted earlier, the lateral stability of the track depends upon the shoulder. The shoulder acquires some amount of stability over time, being compacted by traffic; maintenance tasks such as replacing ties, tamping, and ballast cleaning can upset this stability. After performing these tasks, it is necessary for either trains to run at reduced speed on the repaired routes, or to employ machinery to compact the shoulder again.[19][20]

If the trackbed becomes uneven, it is necessary to pack ballast underneath sunk ties to level the track out again. This is, in the mechanized age, usually done by a ballast tamping machine. A more recent, and probably better,[7] technique is to lift the rails and ties, and to force stones, smaller than the track ballast particles and all of the same size, into the void. This has the advantage of not disturbing the well-compacted ballast on the trackbed, as tamping is likely to do.[21] This technique is called pneumatic ballast injection (PBI; or, less formally, "stoneblowing"[22]). However, this technique is not as effective with fresh ballast, as the smaller stones tend to move down between the larger pieces of ballast.[17]

Quantities [edit]

The quantity of ballast tends to vary with gauge, the wider gauges tending to have wider formations. The depth of ballast also tends to vary with the density of traffic, as faster and heavier traffic requires greater stability. The quantity of ballast also tends to increase over the years as more and more ballast is piled on. Some figures from a 1897 report[23] are:

  • first class line - 60 lb rail - 1700 cubic yards per mile.
  • second class line - 41.5 lb rail - 1135 cubic yards per mile.
  • third class line - 30 lb rail - 800 cubic yards per mile.

See also [edit]

References [edit]

Notes [edit]

  1. ^ a b c d e f Solomon 2001, p. 18.
  2. ^ Hay 1982, pp. 409-410.
  3. ^ a b Bonnett 2005, p. 59.
  4. ^ Solomon 2001, p. 60.
  5. ^ a b c d e f g Bonnett 2005, p. 60
  6. ^ Solomon 2001, p. 19.
  7. ^ a b c Bell 2004, p. 396.
  8. ^ Hay 1982, p. 399.
  9. ^ a b Bachmann 1997, p. 121.
  10. ^ Hay 1982, p. 407.
  11. ^ 150 mm is considered an absolute minimum, and 300 mm (12 inches) being recommended for use in heavy traffic, or with continuous welded rail or concrete ties. Most railways use between 300 mm and 400 mm (16 inches). A 450 mm shoulder significantly increases lateral stability and reduces maintenance effort, though little or no resistance to buckling is gained with a shoulder above this size. See Hay 1982, pp. 407-408; Kutz 2004 24.4.2.
  12. ^ Solomon 2001, p. 40.
  13. ^ "Railway Gazette: Bacteria to clean ballast". Retrieved 2011-02-27. 
  14. ^ a b Selig & Waters 1994, p. 1430.
  15. ^ a b c Solomon 2001, p. 41.
  16. ^ Institution of Civil Engineers 1988, p. 231.
  17. ^ a b IFSC #37, ch. 9.
  18. ^ a b Solomon 2001, p. 43.
  19. ^ Hay 1982, p. 408.
  20. ^ Kutz 2004, 24.4.2.
  21. ^ Anderson & Key 1999.
  22. ^ Ellis 2006, Pneumatic Ballast Injection, p. 265.
  23. ^ "LIGHT RAILWAYS.". The Brisbane Courier (Qld. : 1864-1933) (Qld.: National Library of Australia). 29 September 1897. p. 5. Retrieved 21 May 2011. 

Sources [edit]

  • Anderson, W. F.; Key, A. J. (1999). "Two layer ballast beds as railway track foundations". Twelfth European Conference on Soil Mechanics and Geotechnical Engineering (Proceedings). AA Balkema. ISBN 90-5809-047-7. 
  • Bachmann, Hugo et al. (1997). Vibration Problems in Structures: Practical Guidelines. Birkhäuser. ISBN 3-7643-5148-9. 
  • Bell, F.G. (2004). Engineering Geology and Construction. Spon Press. ISBN 0-415-25939-8. 
  • Bonnett, Clifford F. (2005). Practical Railway Engineering. Imperial College Press. ISBN 1-86094-515-5. 
  • Ellis, Iain (2006). Ellis' British Railway Engineering Encyclopaedia. Lulu.com. ISBN 1-84728-643-7. 
  • Hay, William Walter (1982). Railroad Engineering. John Wiley and Sons. ISBN 0-471-36400-2. 
  • Institution of Civil Engineers (1988). Urban Railways and the Civil Engineer. Thomas Telford. ISBN [[Special:BookSources/0-7227-1337-X|0-7227-1337-X[[Category:Articles with invalid ISBNs]]]] Check |isbn= value (help). 
  • International Federation for Structural Concrete (fédération internationale du béton) bulletin #37.
  • Kutz, Myer (2004). Handbook of Transportation Engineering. McGraw-Hill. ISBN 0-07-139122-3. 
  • Selig, Ernest Theodore; Waters, John M. (1994). Track Geotechnology and Substructure Management. Thomas Telford. ISBN 0-7277-2013-9. 
  • Solomon, Brian (2001). Railway Maintenance Equipment: The Men and Machines that Keep the Railroads Running. MBI Publishing Company. ISBN 0-7603-0975-2. 

Further reading [edit]

New South Wales: Ballast 1850-1987 Longworth, Jim Australian Railway History, December, 2004 pp443–462

External links [edit]

Media related to Ballast at Wikimedia Commons


Original courtesy of Wikipedia: http://en.wikipedia.org/wiki/Track_ballast — Please support Wikipedia.
A portion of the proceeds from advertising on Digplanet goes to supporting Wikipedia.
71955 videos foundNext > 

Tutorial: How to Ballast HO Track

Hey guys, sorry about the delay. Here is a quick video of how you can ballast your track and add a touch or realism to your layout. Please don't forget to co...

09.28.09 HOW TO BALLAST HO TRACK by Al Mayo aka Big Pimpin

Your Boy Big Al back again! EXTRA EXTRA READ ALL ABOUT IT At the end of it there is a call to hook me up with a car, I need to buy a new car! My shit is done...

How to quickly ballast model train track

Everything you need to know is in the video. If you have any question feel free to ask. Subscribe to get notified of any new how to videos!

My CSX/NS HO Railroad Part 30B "Beginning to ballast track"

See part 30A.

How to ballast model railway track

Jennifer's novels are available from http://www.jennifer-kirk.com/Bibliography.html A step by step guide to techniques for laying track ballast on model rail...

How to Ballast track

Things you need to ballast track: 1. glue (50 water and 50 glue) 2. 1 inch paint brush 3. water spray bottle (or misty mate my favorite but mine broke) 4. of...

How to Ballast Model Railroad Tracks

Steps I use to ballast HO scale model Railroad Track.

How to ballast track

This is our latest video of our newly introduced scenic series, as you would have obviously known from the title this video is about ballasting. This video s...

My CSX/NS HO Railroad Part 30A "Beginning to ballast track"

This video describes my way of ballasting track.

How to ballast track

In this clip, I'd like to show how I ballast N-scale track on an actual project.

71955 videos foundNext > 

3 news items

 
Daily Markets (press release)
Wed, 15 May 2013 22:39:12 -0700

The excavated aggregate is of exceptional quality and highly suitable as a top layer for asphalt roads and as rail track ballast. Additionally, the sandstone is used in major and minor (offshore) projects, such as Maasvlakte 2. A sales process has now ...

New York Times

New York Times
Sun, 28 Apr 2013 14:59:38 -0700

... Line, from West 30th Street to West 34th Street, which looks like the rest of the elevated park did during decades of dereliction: beer cans, old birds' nests, scraps of rusted pipe, splintered railroad ties and wild crab-apple trees sprouting from ...
 
Saudi Gazette
Thu, 02 May 2013 15:35:44 -0700

Thus it stands to reason that culverts may be of insufficient dimensions to carry off flood waters and railway track ballast may be inadequately protected against flash floods that could sweep it away. Furthermore, some airports in the Kingdom were ...
Loading

Oops, we seem to be having trouble contacting Twitter

Talk About Track ballast

You can talk about Track ballast with people all over the world in our discussions.

Support Wikipedia

A portion of the proceeds from advertising on Digplanet goes to supporting Wikipedia. Please add your support for Wikipedia!