digplanet beta 1: Athena
Share digplanet:

Agriculture

Applied sciences

Arts

Belief

Business

Chronology

Culture

Education

Environment

Geography

Health

History

Humanities

Language

Law

Life

Mathematics

Nature

People

Politics

Science

Society

Technology

Signpost of the Cycle path

The Greenlink Cycle Path is a cycle path in North Lanarkshire that is a direct route running from Strathclyde Country Park to Motherwell Town Centre. The path is 7 kilometres (4.3 miles) in length. The Greenlink project was established in 2005,[1] and is part of a 3-year partnership between many organisations, such as North Lanarkshire Council, Scottish National Heritage and Forestry Commission Scotland.[2][3]

The route[edit]

The path begins at the Bothwellhaugh Roman Fort (55°47′52″N 4°01′41″W / 55.797666°N 4.028112°W / 55.797666; -4.028112 (Bothwellhaugh Roman Fort){{#coordinates:55.797666|-4.028112|type:landmark_region:GB|||||| | |name=Bothwellhaugh Roman Fort }}) in Strathclyde Country Park, and travels through the woodland area of the park, going over the West Coast Main Line. The path then goes through Bellshill golf course and along the south-east of the town, then travelling over the South Calder Water and the A721. It by-passes the Forgewood suburb of Motherwell heading towards Braidhurst High School, and subsequently travels under the Argyle Line heading towards the new site of the Cathedral Primary School and Fir Park nursery joint campus. The path concludes when it runs through the residential housing area and stops at the Aquatec sports centre (55°47′34″N 3°59′27″W / 55.792901°N 3.99084°W / 55.792901; -3.99084 (Aquatec){{#coordinates:55.792901|-3.99084|type:landmark_region:GB|||||| | |name=Aquatec }}) next door to the town centre.[4]

Future Plans[edit]

Cycle path at Strathclyde Country Park

There are plans in future to extend the cycle path beyond Motherwell town centre to connect to the new town of Ravenscraig. The initial plans prior to formation of the path was to create a direct route from Strathclyde Park to the site of the former Ravenscraig steelworks. Those plans were put on hold due to the delay in the regeneration of Ravenscraig, and so the link only stops at Motherwell town centre.[5]

Awards[edit]

In 2011, the cycle path received the Level 3 It's Your Neighbourhood award from Beautiful Scotland for developing.[6] That same year, the cycle path also received an award for Scotland's finest Woodland, presented to them by the Minister for Environment and Climate Change, Stewart Stevenson, at the Royal Highland Show.

External links[edit]

References[edit]

  1. ^ "Greenlink Case Study". Retrieved 5 August 2012. 
  2. ^ "Greenlink - SROI Method". Retrieved 5 August 2012. 
  3. ^ "Partners, funders and health organisations". Retrieved 5 August 2012. 
  4. ^ "Map of the Greenlink.". Retrieved 5 August 2012. 
  5. ^ "The Greenlink". Retrieved 5 August 2012. 
  6. ^ "Certificates (2011)". Retrieved 5 August 2012. 

Coordinates: 55°48′22″N 4°00′23″W / 55.806148°N 4.006485°W / 55.806148; -4.006485{{#coordinates:55.806148|-4.006485|dim:20000_region:GB|||||| |primary |name= }}


Original courtesy of Wikipedia: http://en.wikipedia.org/wiki/Greenlink_Cycle_Path — Please support Wikipedia.
This page uses Creative Commons Licensed content from Wikipedia. A portion of the proceeds from advertising on Digplanet goes to supporting Wikipedia.
48 videos foundNext > 

Caldecote Port Way (east)

A rough route between two villages. Route http://radwagon.blogspot.com/2013/02/cambridge-video-guide-routes-index.html#396 in Cambridge Video Clip Cycling Gu...

World Champion Cyclist Graeme Obree Opens The New Greenlink Facility ...

Motherwell's New Greenlink Facility is officially opened to the public.

Lynton Green Link Run @ Mitcham Trails

1994 Track Cycling World Championships - Obree Disqualified

Graeme Obree disqualified from the Individual Pursuit during the qualifying rounds of the World Championships. Why? Because the UCI outlawed his riding posit...

Graeme Obree - Innovation on two wheels - IQ2 Cycling festival

http://www.intelligencesquared.com/events/cycling Graeme Obree speaking at the IQ2 Cycling festival on 8th September 2011, at the Royal Geographical Society....

Lynton Depot Trail Run 2.wmv

A second run on the depot trail to the green link at the Lynton MTB Park. This time on a dual suspension bike, I have taken around 20 seconds of my previous ...

Graeme Obree and Gary Fisher chat on "The Cycle Show."

Cycling legends Gary Fisher and Graeme Obree are guests on episode one of ITV's "The Cycle Show." They're nuts!! (Gary Fisher joins at 2:10.)

Full Cycle

A short film that explores what it takes both mentally and physically to win at the highest level of World Cycling featuring Graeme Obree.

Graeme Obree teaching Des to cycle

Check out Des getting his second ever cycling lesson...this time from former World Champion Graeme Obree.

You+Me - You and Me (Lyric)

Pre-Order the album rose ave. and receive “You and Me” instantly on iTunes: http://smarturl.it/RoseAve?IQid=ymyt Pre-Order on Amazon: http://smarturl.it/Rose...

48 videos foundNext > 

We're sorry, but there's no news about "Greenlink Cycle Path" right now.

Loading

Oops, we seem to be having trouble contacting Twitter

Support Wikipedia

A portion of the proceeds from advertising on Digplanet goes to supporting Wikipedia. Please add your support for Wikipedia!

Searchlight Group

Digplanet also receives support from Searchlight Group. Visit Searchlight